Service overview
We check what your lot allows before anything gets drawn. Then you get one written price for the whole addition, with finishes matched to the house you have.

Home addition options



How it works
An addition is a structural project, even when it looks like a remodel. The foundation and the roof tie-in have to be right, and the finish has to match a house that has stood for decades. We plan both at once, so the new room looks like it was always there. That goes for a ground-floor room addition and for a second story addition. Looking for a separate unit? See ADUs and garage conversions.
We look at your lot, setbacks, and what the city will allow before anything gets drawn. Hillside conditions and HOA rules get checked here.
Plans go to an architect and a structural engineer. You see layout and elevations before they head to plan check.
We submit the plans to your city and handle any corrections. Plan check takes longer in some cities than others, and we give you a realistic timeline for yours.
We pour the footings, build the slab or raised floor, frame the walls, and tie in the roof. Inspections are scheduled as each stage is finished.
We match the stucco, siding, roofing, windows, and interior finishes to the existing house, so you can't tell where the old part ends.
What's included

Roof pitch, stucco, windows, and trim matched so the addition feels original.

Windows sized for light and efficiency, tied into the new envelope correctly.

Closets and built-ins planned into the layout so the new square footage works hard.

Interior and exterior finishes chosen to match the house you already live in.

Free estimate
Tell us about the project and we'll call you back within one business day.
Why choose us
We check setbacks and hillside rules first, so you never pay for a plan the city rejects.
Engineering, foundation, framing, and finish in one written scope before ground breaks.
We submit to LADBS or your city and answer the corrections for you.
Stucco, roofline, and trim matched so nobody can tell where the old house ends.

Talk to the crew
You get a written price before any work starts. If the project isn't a good fit for us, you still keep the written scope.
Recent work
Service areas
Where we work
Pick a neighborhood on the map or from the list. Each area page covers the local permit office and the homes we see there.
FAQ
Lot setbacks, hillside or HOA rules, and how the new room should connect to the house. We check feasibility before drawings so you are not paying for a plan the city will reject. The free LA Remodel Decision Sheet lists what to settle before you call an architect.
Living space additions, second story additions, extra bathrooms, home offices, and guest or primary suites. Many owners pair an addition with a kitchen remodel so one crew handles both.
Plan a few months for design and plan check, then four to eight months on site depending on size. City permit timing is the part nobody can promise. Cities like Beverly Hills and Pasadena run their own plan check.
Yes. Attached and detached ADUs and garage conversions have their own page: ADU contractor in Los Angeles. Our Encino garage conversion became a permitted one-bedroom rental in two months.
Usually yes, since most of the work happens outside the existing envelope. There is a stretch during the tie-in when it gets loud and dusty, and we tell you when that is coming.