Service overview
As your kitchen remodel contractor, we show you the layout, your selections, and the full price before the old kitchen comes out. Most jobs take six to twelve weeks on site.

Kitchen remodeling options



How it works
A kitchen has to handle dinner on a Tuesday and a full house on the weekend. So every kitchen renovation we do in Los Angeles starts with the layout. Cabinets and stone go on top of a plan that already works. You get a written price for labor and materials before demolition, plus one crew lead you can call from the first visit to the final walkthrough.
We measure the room, look at what is behind the walls, and talk through what annoys you about the kitchen you have. Plumbing and electrical get checked here, because that is what moves a budget later.
We map the new plan and price it against real cabinet, counter, and appliance choices. You see options at a few price points before anything gets ordered.
If the scope needs a permit, we file it. Long-lead items like cabinets and stone go on order early so the schedule is never waiting on a truck.
The old kitchen comes out. Framing, plumbing, electrical, and any structural change happen while the walls are open, and inspections get scheduled around them.
We install the cabinets, counters, tile, and fixtures, then paint. At the end we walk the room with you and fix any small items before we call it done.
What's included

Cabinets sized to your layout, with finishes that match the rest of the house.

Central islands that add workspace, storage, and a place for people to gather.

Quartz, natural stone, and tile picked to hold up to heat and daily use.

Task and ambient lighting planned so the room works at noon and at night.

Durable flooring installed level and sealed for a kitchen that gets walked on hard.

Pull-outs, pantry systems, and smart storage that keep counters clear.

Free estimate
Tell us about the project and we'll call you back within one business day.
Why choose us
Labor and materials for your kitchen in one written scope. You know the number before the old cabinets come out.
If plumbing, gas, or a wall moves, we file with LADBS or your city and schedule the inspections.
Cabinet and stone lead times decide the schedule. We order them during plan check so the crew is never waiting.
We check every joint and grout line on the final walkthrough, and we fix the small items before we call it done.

Talk to the crew
You get a written price before any work starts. If the project isn't a good fit for us, you still keep the written scope.
Recent work
Service areas
Where we work
Pick a neighborhood on the map or from the list. Each area page covers the local permit office and the homes we see there.
FAQ
Start with how you cook, how much storage you need, and whether the layout has to move. We walk the room with you, check plumbing and electrical, and price the real scope before demolition. The free LA Remodel Decision Sheet lists the questions to settle first.
Semi-custom uses configurable cabinet lines and finish options that still fit your room. Fully custom builds cabinetry and layout from scratch around your exact plan. Both can look high-end. The difference is how much of the box is made for your space.
Most kitchens run six to twelve weeks on site once materials have landed. Cabinet lead time is usually the long pole, so we order early and give you a date range after the walkthrough. See how our Pasadena kitchen remodel came together.
In the City of Los Angeles, LADBS requires one when plumbing, gas, or electrical moves, or when a wall comes out. Swapping cabinets and counters in the same spots usually doesn't. Cities like Beverly Hills and Pasadena run their own building departments. We tell you which rules apply before you commit.
The biggest cost drivers are room size, moving walls or plumbing, cabinet construction, stone, appliances, and permit requirements. Your free Clear-Plan Walkthrough turns those choices into labor and material numbers for your house before demolition.