Overview
The owners wanted an updated layout, new bathroom flooring, and paint inside and out.
The load-bearing wall between the living room and kitchen came down, and those rooms are now open.


One bedroom was removed and rebuilt as a master suite with walk-in closets and a new full bathroom.
The existing bathroom was remodeled in the same project.


Electrical wiring, water lines, drains, HVAC, and drywall were replaced.


New windows and doors went in with that work.
The kitchen has slim shaker cabinets and new countertops.

Floors are 8mm waterproof vinyl.

Bathroom tile is Italian.


Paint covers the interior and the exterior.
Before and after














Results
None of the old interior remains.
The kitchen and living room are one open space, and a bedroom is now a master suite with walk-in closets and a new bathroom.
The job took about three and a half months from plan submittal to the last of the paint.
Lining up the trades was the hard part.
Electric, plumbing, HVAC, drywall, and finishes had to follow each other, or days piled up.
The finish still had to be right.
The owners were happy with the house.