West Los Angeles · Westside
Home remodeling in West Los Angeles usually means a 1940s or 1950s house that still has its original layout, wiring, and plumbing. We plan the whole house as one job. That covers opening the kitchen, updating the baths, new electrical and plumbing, floors throughout, and paint, under one LADBS permit set with one schedule. If the lot allows, an addition or ADU can go in the same project and the same plan check.
Call (323) 393-6552 · California Contractor License #1148002 · 5.0 on Google

Permits and local rules

Home Remodeling in West Los Angeles
Filing a West LA remodel and an addition together means one plan check, one set of inspections, and one move-out instead of two.
How it works
Premier Hi-End Builders is a licensed Los Angeles general contractor for whole-home and multi-room remodels. One crew handles layout and structural changes, electrical, plumbing, and HVAC, kitchens and baths, flooring, windows, and paint on one schedule, with permits and a written price before demolition.
We walk every room, open the panel, and look at the plumbing and attic. The age of the systems decides half the budget, so we check them first.
Layout changes go to an engineer when walls come out. You see the plan, the selections, and the price for the whole house in one document.
We file with the right building department for your address and order long-lead items like cabinets, windows, and tile while plan check runs.
We handle demolition, framing, and the electrical, plumbing, and HVAC rough-in, then inspections, insulation, and drywall. Each trade starts when the last one passes inspection.
We install the cabinets, tile, floors, and doors, then paint. At the end we walk the whole house with you and fix any small items before we call it done.
Our work

Free estimate in West Los Angeles
Tell us about the project and we'll call you back within one business day to set up a visit.
FAQ
For most post-war homes, three to five months on site after permits. Adding square footage adds time.
For multi-room work we can often phase it so a kitchen or bath stays usable. A full gut usually means moving out during rough-in.
Usually layout changes, new electrical, plumbing, and HVAC, a kitchen, one or more baths, flooring through the house, windows and doors, and paint inside and out. We set the exact list on the walkthrough. Some owners add a home addition or an ADU in the same project.
Our Encino full remodel of about 1,200 square feet took about three and a half months from plan submittal to final paint. Larger homes, structural work, or slow plan check add time. You get a date range in writing.
Other services in West Los Angeles
Home Remodeling in West Los Angeles